Projects
MACDILL AIR FORCE BASE, Tampa FL
Sauer Incorporated working with the Army Corps of Engineers required over 600 piles for an expansion to the base. As all Army Corps of Engineers projects the safety and quality requirements were extremely stringent. HJ Foundation obtained approval for all requirements and completed the project ahead of schedule.
Contact HJ Foundation
U.S. HEADQUARTERS
| Phone: | (866) 751-4545 |
| Fax: | (305) 592-7881 |
| Address: | 8275 NW 80th Street Miami, FL 33166 |
| Email: | info@hjfoundation.com |
| Offices: | Tampa, Fort Myers, Atlanta, Chicago |
Projects
France Road TCI Warehouse - New Orleans, Louisiana

Our ease of contracting and ability to perform the fastest quality work in a safe manner allowed our client to save two weeks on schedule without additional unforeseen costs....
Projects
Hotel Victor
The Hotel Victor is located mere inches away from the historic Versace Mansion on Miami Beach’s Ocean Drive.
Projects
Marina Blue
Hyperion Development Group’s Marina Blue is situated at 800 Biscayne Boulevard. Construction of the 629-foot-high, 60-story, curvilinear structure required HJ Foundation to install approximately 300, 30-inch diameter piles 122 feet deep.
