The Bottom Line: Our ease of contracting and ability to perform quality work in a highly productive and safe manner allowed our client to save 3 weeks on schedule.
Ease of Contracting:
HJ Foundation was contacted by Brasfield & Gorrie / Lemoine Company, A Joint Venture, after having disputes on contract wording with another subcontractor, prior to mobilization . We were able to reach agreement on price and contract in less than 2-days and had equipment on site in Lafayette, Louisiana in less than 1 week. We successfully installed 6 load test piles and performed all testing in less than 2 weeks from mobilization.
Schedule Savings:
HJ Foundation committed to an aggressive 6-week production schedule, running 2 rigs simultaneously, to install 872 piles. Drawing changes resulted in the requirement to install 1,016 piles (16% additional piles). We are proud to have successfully completed all production pile installation in just 16 days – 3 weeks ahead of our committed schedule.
Quality:
HJ Foundation used state-of-the-art survey grade equipment to ensure our piles were installed within specified tolerances. We are extremely proud of our results on this project with more than 96 percent of piles installed within specified tolerances - well above industry standards. The high quality of our as-built locations resulted in zero remedial work required on our piles. Piles installed within tolerances also sped up the engineer of record's review time, thus allowing the shell contractor to form and pour their caps without unnecessary delays.
Services Provided:
-
1,000+ augered piles
-
18-inch diameter (66-ton & 87-ton compression piles)
Scope of Work:
-
Pile load testing on (6) piles
-
Production pile installation
-
All grout
-
Furnish & install pile rebar
-
Stockpile and remove from the site all spoils for disposal
-
Perform pile layout & as-built survey (by Registered Surveyor)
-
Shooting all grades and verification of all horizontal layout (Internal to HJ Foundation)
Firms Involved on the Project:
-
Owner: Our Lady of Lourdes Regional Medical Center, Inc.
-
Contractor: Brasfield & Gorrie / Lemoine Company, A Joint Venture
-
Engineer of Record: TRC Worldwide Engineering
-
Geotechnical Engineer: SITE Engineering
-
Inspections & Testing: Professional Services Industry
Contact HJ Foundation
U.S. HEADQUARTERS
| Phone: | (866) 751-4545 |
| Fax: | (305) 592-7881 |
| Address: | 8275 NW 80th Street Miami, FL 33166 |
| Email: | info@hjfoundation.com |
| Offices: | Tampa, Fort Myers, Atlanta, Chicago |
Projects
Majestic Star Casino & Parking Garage - Pittsburgh, Pennsylvania

HJ Foundation installs over 1,700 piles, at the height of winter, with very difficult site conditions, ahead of schedule and with zero safety incidents at this landmark casino in Pittsburgh...
Projects
Hotel Victor
The Hotel Victor is located mere inches away from the historic Versace Mansion on Miami Beach’s Ocean Drive.
Projects
Marina Blue
Hyperion Development Group’s Marina Blue is situated at 800 Biscayne Boulevard. Construction of the 629-foot-high, 60-story, curvilinear structure required HJ Foundation to install approximately 300, 30-inch diameter piles 122 feet deep.