Projects
UNIVERSITY OF FLORIDA, Gainesville FL

University of Florida’s Ben Hill Griffin Stadium has undergone several renovations since 1930 when it seated approximately 21,000 fans. Today, its capacity is just shy of 90,000, making it the largest stadium in the state. In 2001, the University of Florida contracted HJ Foundation to install 576 16-inch by 55-foot long piles to support the addition of roughly 3,000 new luxury club seats, an expanded press level, a renovated and enlarged Bull Gator Deck, an enlarged President’s Suite and 34 additional suites. The entire expansion was scheduled for completion in less than two years and HJ Foundation successfully installed all 1,223 50-foot piles on schedule.
Contact HJ Foundation
U.S. HEADQUARTERS
| Phone: | (866) 751-4545 |
| Fax: | (305) 592-7881 |
| Address: | 8275 NW 80th Street Miami, FL 33166 |
| Email: | info@hjfoundation.com |
| Offices: | Tampa, Fort Myers, Atlanta, Chicago |
Projects
Marina Blue
Hyperion Development Group’s Marina Blue is situated at 800 Biscayne Boulevard. Construction of the 629-foot-high, 60-story, curvilinear structure required HJ Foundation to install approximately 300, 30-inch diameter piles 122 feet deep.
Projects
6000 Indian Creek
The building’s unique location on the Intracoastal Waterway creates spectacular views for residents, but also presented a series of challenges for HJ.
Projects
Majestic Star Casino & Parking Garage - Pittsburgh, Pennsylvania

HJ Foundation installs over 1,700 piles, at the height of winter, with very difficult site conditions, ahead of schedule and with zero safety incidents at this landmark casino in Pittsburgh...
