Projects
MARINA BLUE, Miami FL
Hyperion Development Group’s Marina Blue is situated at 800 Biscayne Boulevard. Construction of the 629-foot-high, 60-story, curvilinear structure required HJ Foundation to install approximately 300, 30-inch diameter piles 122 feet deep. At the time, these piles were the largest and longest augercast piles available on the market. HJ’s ability to manufacture our equipment in-house, allowed us to not only propose such massive piles, but to install and test the piles with both confidence and ease.
Contact HJ Foundation
U.S. HEADQUARTERS
| Phone: | (866) 751-4545 |
| Fax: | (305) 592-7881 |
| Address: | 8275 NW 80th Street Miami, FL 33166 |
| Email: | info@hjfoundation.com |
| Offices: | Tampa, Fort Myers, Atlanta, Chicago |
Projects
Hotel Victor
The Hotel Victor is located mere inches away from the historic Versace Mansion on Miami Beach’s Ocean Drive.
Projects
Our Lady of Lourdes Replacement Hospital - Lafayette, Louisiana

Our ease of contracting and ability to perform quality work in a highly productive and safe manner allowed our client to save 3 weeks on schedule...
Projects
France Road TCI Warehouse - New Orleans, Louisiana

Our ease of contracting and ability to perform the fastest quality work in a safe manner allowed our client to save two weeks on schedule without additional unforeseen costs....
